Where does the boiler stop?
Choose what you can see. PlumbParts AI will take you to the next useful test.
Choose one
Is there a demand for heating or hot water?
Confirm the programmer, room thermostat or hot-water demand is calling.
What happens before it stops?
What is not working?
Need to test a component?
System boiler → combi
Survey first, then plan the conversion. Expand each stage for the checks that matter.
Engineer planning aid for domestic gas installations in England. Gas work and appliance commissioning require appropriate Gas Safe registration and competence; electrical work requires electrical competence. Use the exact installation manual and the regulatory requirements applicable to the job.
Boiler heats radiators and the cylinder coil. Stored domestic hot water supplies the taps.
Sealed heating circuit remains separate. Mains cold water passes through the combi to hot-water outlets.
See the conversion at a glance
Typical indirect-cylinder arrangement. Trace the actual system first: cylinder supply can be mains-fed or cistern-fed. Dashed red lines mark redundant coil branches; line colours describe circuits, not wire colours.
After · reconnect to the combi
Verify / upgrade supply by calculation and tests for maximum appliance input. No assumed pipe size.
New approved flue system; verify route, lengths and clearances from the exact manual.
Plan fall, material, termination and frost protection to manufacturer instructions.
Provide the specified safety discharge route. Condensate and PRV routes have different requirements; combine only where an approved arrangement explicitly permits it.
Retain required heating zones and interlocks. Replace / configure the control as needed; remove redundant cylinder-stat and hot-water channel functions.
Remove incompatible gravity shower pumps. Do not remove a cistern still feeding retained services. Avoid redundant dead legs.
Functional overview, not a physical pipe layout or installation specification. Gas, flue, electrical wiring, filling arrangement and safety connections are listed separately. Verify every appliance connection in its exact manual.
The mains cannot meet demand; several showers must run together beyond the combi capability; existing fittings cannot tolerate mains pressure; a safe gas, flue, condensate or discharge route cannot be achieved; or the heating system cannot meet the new boiler’s requirements. Resolve the design or retain an appropriate cylinder solution.
Official references
- Worcester Bosch · mains supply checks
- Worcester Bosch · shower compatibility
- GOV.UK · Part L and applicable editions
- HSE · domestic gas safety
Reviewed 12 October 2026. These references support survey and compliance checks; this overview does not replace the selected boiler’s installation instructions.
Find the code. Prove the fault.
Use the code as a starting point, then confirm the failed stage before changing a part.
Quick checks
Model check: Code meanings can vary by boiler generation. Confirm the GC number or serial number and use the exact manufacturer instructions.
Match the boiler before entering service mode.
Select the appliance and record its identifier. The guide will show the correct manufacturer terminology and build an exact official-manual search.
Why the identifier is required: A family name can cover several control panels. Never use a remembered button sequence from a different generation. Confirm maximum/minimum-rate selection, time limit and exit method in the exact appliance instructions.
Match the control before wiring it.
Select the thermostat, heating system and boiler control input. The guide will build the installation, pairing and proving sequence.
Wiring diagram
Use terminal functions from the exact boiler and thermostat instructions. A spare core, neutral-coloured core or existing link must be tested and identified before use.
Compatibility check: Do not connect a 230 V output to volt-free, OpenTherm, eBUS or other low-voltage terminals. Retain or remove boiler links only as shown in the exact appliance instructions.
Match, code and commission the replacement board.
Record the exact appliance and both PCB numbers before using any coding value, code plug or parameter set.
Final authority: Use only the coding value, plug, memory device or parameter set specified for the exact boiler and replacement PCB. If the old board cannot be read, obtain the value from the manufacturer’s technical information—not from a similar boiler.
Identify the part before ordering.
Match the appliance and old component details after the diagnosis has been confirmed.
Select the confirmed component
Complete the appliance and component details. Add the GC, serial or old part number before ordering.
Check today’s total cost
Open each merchant, search using the copied appliance and part details, then record the current price and stock.
Before fitting: Check the merchant or manufacturer supersession, connectors, ratings and included seals against the exact appliance instructions.
Find the right appliance manual.
Build an exact search, then open the manufacturer’s own document library.
Installation & servicing instructions
Engineer check: Use the document revision for the exact appliance. Test values, wiring, fault meanings and component procedures can change between generations.
Prepare a customer quotation.
Enter the job details and costs, then copy a WhatsApp-ready quotation or save it as a PDF.
1 Customer and reference
2 Work and price
3 Terms and notes
07412 381264 · info@plumbstargas.co.uk
Job case notes
Record what happened on the job. Leave any section blank if it does not apply.
This section is being prepared. Use Diagnose for the live fault-finding flow.